Ghoti–Sinnar Road (MSH-12) Soil Stabilization & PQC Work

Location

Igatpuri, Nashik, Maharashtra

Year

N/A

Executive Summary

Execution of Soil Stabilization and Pavement Quality Concrete (PQC) works on the Ghoti–Sinnar Road (MSH-12) from Km 0/000 to Km 14/000. The project strengthened the pavement foundation and delivered a durable roadway capable of handling long-term traffic loads.

The Challenge

Maintaining construction quality under varying soil conditions while ensuring timely execution and minimal disruption to local transportation.

The Solution

Advanced soil stabilization techniques, precision PQC paving, and strict quality assurance measures were adopted to create a strong and durable pavement structure with improved service life.

Technical Specifications

Road Length

14 KM

Project Type

Soil Stabilization & PQC

Road

MSH-12